Raidhen Posted July 13, 2022 Posted July 13, 2022 Hi, Mission 12 need some tweaking, JTAC should designate the APC first since they are the primary threat for the team and then other assets. SEAL team have laser designators for this kind of night mission you should introduce it in the JTAC options. Another suggestion, the poor IA need some help to focus their attacks; giving command to focus on APC first can help the player to divide the burden with its wingman. For the loadout priority should be PGM to avoid killing friendly units on the ground. Keep the good work this campaign is well designed. 1 Raidhen
SorelRo Posted July 14, 2022 Posted July 14, 2022 I checked this one and when setting up the laser It's NO LOS. I'll try to tweak it and see if I can place a unit in a spot where there's line of sight to the APC's, indeed it would make things so much easier and accurate on how the SEALS operate.
Raidhen Posted July 14, 2022 Author Posted July 14, 2022 Thanks for taking care of the feedbacks. You can use a Reaper as a FAC(A) flying above SAMs' range to relay information from the SEAL. In fact the Reaper operate as the JTAC, in this case no more LOS problem. Raidhen
SorelRo Posted July 14, 2022 Posted July 14, 2022 Correct, they were not available in 2002. I think they got introduced in 2007.
Raidhen Posted July 14, 2022 Author Posted July 14, 2022 You are right for this timeframe you can use a Predator or another Harrier. In the same spirit you should lock the GBU-54 since it wasn't available before 2008 definitely not in 2002, same for the APKWS, GBU-38, GBU-32 and AGM-65L. AN/AAQ-28(V) LITENING G4 was delivered in 2008 but we have no previous versions implemented for the Harrier. Maybe you should change the year for the campaign to 2012+, every assets was introduced before this date. Raidhen
SorelRo Posted July 15, 2022 Posted July 15, 2022 1 hour ago, Raidhen said: You are right for this timeframe you can use a Predator or another Harrier. In the same spirit you should lock the GBU-54 since it wasn't available before 2008 definitely not in 2002, same for the APKWS, GBU-38, GBU-32 and AGM-65L. AN/AAQ-28(V) LITENING G4 was delivered in 2008 but we have no previous versions implemented for the Harrier. Maybe you should change the year for the campaign to 2012+, every assets was introduced before this date. A tad too late for this now I'll see what I can do about the rest. Thanks for the suggestions.
Recommended Posts