With the logical changing in STEP mode for the JSAW, I'm having difficulties to figure out the proper way do release the weapon. Imagine you have 4 different targets and you have 2 racks with 2 JSAWs in each one, how to program each JASOW to hit each one of the 4 targets?

 

Thanks!

Posted

You can't program different targets on jsows for the same rack atm

 

 

What you would need to do is program one target per pylon on PP1, then to the same on PP2

 

 

Then release two jsows (one per pylon), change the PP and release the other two

 

 

Same goes for JDAMs

 

 

 

hope it helped

Win10 64, MSI Krait Gaming Z370, I7 8700K, Geforce 1080Ti FTW3 ,32 GB Ram, Samsung 980 EVO SSD

 

Modules: Combind Arms, A-10C, F-86F, F/A-18, F-16, Flaming Cliffs, KA-50, L-39, P-51, UH-1, Christen Eagle II, Persian Gulf

Posted

How to program the 2 JSAW's of the same rack, I mean, I can enter L/L for 1 JSAW in PP1, but not for the 2nd JSAW; At least I didnt figure out.

Posted

but I think there is a bug....after programming the tgts in PP1 and PP2 and in range to pickle, I select PP1, station 2, pickle, step, station 8, pickle

 

select PP2, station2, pickel, step....does not change to station 8, remains in station 2. And if I pickle, the JSAW goes to the target set for station 8.

Posted (edited)

Yea, the bug is that the STEP order on the Stores page (correct order) doesn't match the physical release release order (incorrect order). The stations try to release 2-3-7-8 instead of 8-2-7-3. If you use QTY selection for all stations for every pickle instead of stepping manually, it'll work. The release order will be in correct, but the bombs will hit their targets.

Edited by Tholozor

REAPER 51 | Tholozor
VFA-136 (c.2007): https://www.digitalcombatsimulator.com/en/files/3305981/
Arleigh Burke Destroyer Pack (2020): https://www.digitalcombatsimulator.com/en/files/3313752/

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...