Hi,

Baseline: I want to be on a specific point, at a planned TOT and at a specific speed

If for the TOT part on a defined WP there is no problem, the addition of the speed variable (GSPD) seems to be a problem.

TOT at 04:10:00 Zulu on WP 2 with GSPD at 500 kt

I have a problem with the system making me arrive 2 minutes early despite the fact that I am respecting the required speeds

Have you managed to get this option to work correctly?

 