Jump to content

xentxo

Members
  • Posts

    142
  • Joined

  • Last visited

Everything posted by xentxo

  1. Actual i dont know what you mean with "optimal climb rate". There is Vy = best rate of climb (best time) and Vx = best angle of climb (best altitude) and both performances are done with 100% thrust and not with 97% thrust. For example Vy at 1000m is between 530km/h (8000kg load,clean) and 725km/h (1000kg load, clean) at a standard day =15degCel, no wind, 1000m Alt.
  2. SZU-23 should be ZU-23-2(truck) Enroute speeds are set at 390 km/h. Best range speed with suggested default load at 3000m alt is 620 km/h for the Su-25T. Also nice to have would be ... - target elevation - times the target images were shot - map scale of the target map - declared time of take-off (Spetsnaz transport) - estimated TOTarget (Holding pattern) of Spetsnaz transport - some Air Traffic Control chatter during T/O at Sukhumi Babushara Airport Not really the safest but a possible route for a low level carpet bombing attack(100m AGL): Only one attack run is needed but the attacker would be exposed to incoming fire for appr. 16 seconds at speed 700kph.
  3. My expierence: Done everything right but lost the whole campaign. Mission 00: 07:00 Entering the cockpit 07:00 Preflight 07:05 Refuel & Rearm completed, TakeOff weight 4kg about maximum 07:08 Request engine start 07:15 Preflight completed (map study, wind condition, fence in, fence out etc.) 07:17 Taxi Clearance 07:20 Blocks off 07:22 Take/Off Clearance Rwy 07 07:22 Left engine failure 20km/h before rotation speed Rejected Take-off procedure, come to standstill 20meter before RWY end, left Engine on fire. 07:23 All engines shutdown, electric Master off 07:23 Call ATC: "Declare emergency" Mission end result: "you are defeated. Mission & Campaign over" ------------------------------------------------ My personal conclusion after this... pluses - weather data believable - very good voice file - ingress/egress points - after the short briefing and the radio anoucement of HQ not many questions are remain unanswered minuses - in a normal landing pattern the base leg for this a/c is flown ca. 6 km from threshold Others The landing pattern is not part of the route legs (is not be displayed and worked out on flight plans). Approach to home base is just one leg to the base airport.
  4. For the sake of completeness: Avialogs is free to read, or subscribe and pay 14 USD to download files for 6 months.
  5. you are flying 840 kph TAS - not KTAS 840 kph TAS = 516 mph TAS 840 kph @ 8920 m = 585 kph IAS ( which should be max speed for an A-50) Your escort speed of 840 kph TAS is 430 kph above estimated(!) stall-speed (clean config) of the Su-27. You should handle this with ease.
  6. OCE Classified" stands for "Operation Chosen Eagle Classified"? i think airway flightlevels should be coordinated with international VFR Cruising Flight levels. For example TC Tango with 260° heading are forced to fly at FL130-FL140. According to international rules a flight in VFR-Mode with heading 80° (opposite of 260°!) could choose FL135 for his cruising and is therefor on collision course with Airway "TC Tango".
  7. Spelling errors: "You may complete your mission by landing at Besian Airfield" "support the operation by destroying targets of oppurtunity\" If this is the follow up of the mission "Request_Immediate_Support" then you should name the missions with prefixis such as Solidus_01_Request_Immediate_Support.miz Solidus_02_MSN_2_-_53_-_Recon_-_W_56_61_71__L_51.miz Would be nice to have some professional ATC chatter (soundfiles) during rampstart for example. Current briefing infos are what i would expect from a briefing: estimated target position, estimated qty, estimated type of threat, bullseye position etc. Good. What i am missing are basic infos of other friendly activities during briefing. What is the flight plan of Su27 air recon in Mission 1 for expl. But i can simulate the info whit the F10-Map with friendly only view. Mission 1 has no realistic weather data.
  8. you are rigght. i misread the topic. actual i doubt that tis is modeled. if it is modeled i am pretty sure the a10c community can give further advices. In any case, one should note this thing: at 100kph headwind or in calm wind condition, on each run the TAS(!) indicator in the plane must show the same speed over ground.
  9. http://www.amazon.com/Su-25-Frogfoot-Units-Combat-Aircraft/dp/1472805674/ref=sr_1_2?ie=UTF8&qid=1421208365&sr=8-2&keywords=su25 plus several others ln amazon
  10. did you see the cutawaydrawing on page 37 bof book 4+ publication - Suchoj Su-25.pdf? this could be a start.
  11. You can ask for example "OAT shows -15 C°, i am at 15000 ft Pressure Altitude, loadout 5000kg, Drag Index 50%, what is the V_BR (best range speed) for the su25 at those conditions?" V_BR and V_MO and other V speeds depend on many factors
  12. The table shows the magnetic deviation of the local plane. Not modeled in the sim. For wind correction calculation use some online sites: for expl. http://www.pilotoutlook.com/calculators/wind-speed-direction-correction-angle
  13. 4.8 g if TAS 5.0g if IAS Mass of the airplane apparently plays no decisive role
  14. - Intro mission, at the beginning of the route, planned route speed in ME is to low (i assume the cruise speed for this bird is 800km/h or so). Also the planned Altitude should be min. 70m AGL. A common prof. route planning would look like this + immediately after t/o climb to cruise altitude (min 6000m, better 10000m or higher) with best climb speed + Cruise 20km (or so) near the OArea, hold altitude, using best cruise speed + Descend towards OA + Playtime + Climb to curise altitude with best climb speed + RTB, holding altitude, cruise speed + descent/glide to ILS approach. The beginning of the descent depends on your altitude, speed etc. + land 2 nice missions. Thxs.
  15. "I clearly made some mistakes" Picked up the wrong Countermeasure program? Defensive maneuvers were not aggressive enough? What was wrong?
  16. Calculated Take-off time = Actual Ready Time for movement (5 min) + Taxi-Out Time (5 min) So CTOT should be 12:10 The outbound route altitude is to low. At least 5500m is required to cross the caucasus mountains. The same goes for the return flight. We are forced to do the fuel calculation in the cockpit. It would be more realistic you give us the information we need (route-map, total routelength) during the briefings. Dont spoil the action in the mission with comments like "(this mission is) Nothing spectacular, just a sightseeing trip, more or less"
  17. In reality pilots have good reasons to calculate bingo fuel with additional reserve fuel. Official F14 bingo fuel calculation requires 2000lb ( = 900kg = 1150litre = 20 minutes flighttime) reserve fuel. So far i see a refuel stop at adler requires appr. 20-30 minutes. In this period the convoy travells 3.5 km east. The additional time will not not jeopardise the mission objectives.
  18. Downloading ... Bingo fuel is defined as ... Climb to Cruise Level (from attack Area, here Convoy location) + Cruise to Home Field (here Adler) + Cruise to Alternate (would be Gudauta) + Reserve ( normaly 100km) So 600-900 litre cant be "Bingo Fuel"
  19. Some questions: -Which mission is the campaign start? Is it random within Stage 3? -What's the meaning of Initial Point "MAZDA'? -So you wait until v3.x is out. What would you do if the performance will not get any better? You have to redesign 80 - 100 missions. So another 6+ months of work or will you throw everything and will start a new campaign? Tip: Normaly audio-files are converted into ogg-files and not wav-files. This will shrink the whole Fall campaign to a tenth of its original size.
  20. Question in response: how do you get that markings? I see no markings on the kneeboard map except the planned flight route.
  21. A inconsistency occurred to me ;) in the v0.4 (maybe this is also true in the current version) On 23th march the US president told us "8 planes are scheduled to land in Kobuleti Airbase on March 29th" But the planes actually arrived long ago. At the 27th March. ;) Either the US president cant memorize specific dates or he has been misinformed ...
×
×
  • Create New...